Blackwood Building Co was engaged to value manage the build cost whilst maintaining the design intent. This included some amendments in construction methodology, material substitution & minor size reduction.
Project Commenced | April 2023
Project Duration | 10 months
Project Value | POA
Location
Clayfield | BrisbaneArchitect
Mason Bright